Meat6788 Meat6788 23-12-2022 Business contestada In a BIP problem, 1 corresponds to a yes decision and 0 to a no decision. If there are 4 projects under consideration (A, B, C, and D) and at most 2 can be chosen then the following constraint needs to be added to the formulation: