makaliahh8371 makaliahh8371 24-05-2023 Mathematics contestada An assembly process has 5 distinct operations, with standard times given below. The required production rate is 600 units/week (assume 8-hour day, 5-day week). a. 8.92 min b. 5,25 min 14.27 min d. 1.58 min e. 7.53 min