Determine the production capacity achieved by an operator with a performance rating leveling factor of 90%, who worked 6.95 hours in an 8-hour shift, for time lost at 15% compensation. The standardized time of operation is 18 seconds per unit. Select one: None of the above 1440 unit 1438 units 1442 units