A chain of well-known Cafés in Sydney and Melbourne has decided to open a smaller version of their larger shops in Canberra. The name of the Café is Aroma. The café in Canberra will be based in Manuka. The Melbourne and Sydney Cafés have an attached-on site industrial bakery that produces all of their bread, pastries, pies and cakes on site. In Canberra the company's bakery is based in Fyshwick and does not have a café attached to it. The bakery in Fyshwick operates from 0200 (2am) through to 0900 (9am) daily-7 days a week The café in Manuka will operate from 0700 (7am)-1600 (4pm)-7 days a week. This version will NOT have the bakery on site; however, this café will be receiving all of their required bakery products from their own bakery based in Fyshwick (run by the same company-but at a different location). You have 3 staff members to assist you throughout the project. You are to allocate their roles and names in the assessment. ALLOCATED BUDGET TO COMPLETION AND HANDOVER: $75000.00 (AUD) Aroma Café Details: The basic details of the Manuka Aroma café are: . Will be set up for 16 tables and chairs of up to 4 patrons each • The café will be located inside a Marketplace . It will have an underground carpark with small cage storage unit . Will have a long counter with display units of all the baked goods . Bread racks will be located behind the counter with a bread slicer nearby • A large, specialised coffee machine will be to the right of the display units • The space between the two will be the area that orders are placed • There is a utility room behind the counter with an additional storage-both refrigerated and cupboard . A small space will be allocated for staff in this area as well. A Café Manager has been appointed; His name is David He is recruiting the remaining staff required for opening courses/513/assignments/21 Capital Coge ASSESSMENT TASK 1: PROJECT PLAN TASK SUMMARY: YOU ARE THE PROJECT MANAGER OF THE PROJECT OUTLINED BELOW AND ARE TO COMPLETE THE PROJECT PLAN TEMPLATE AS PROVIDED IN DETAIL WHAT DO I NEED IN ORDER TO COMPLETE THIS ASSESSMENT? . Computer and Microsoft Office . Access to the Internet for rese . Project Plan template WHEN DO I DO THIS TASK? . This as may be done in four own time WHAT DO I NEED TO SUBMIT? Completed Project Plan jevery paget-USE THE TEMPLATE PROVIDED WHAT DO I NEED TO DO IF I GET SOMETHING WRONG? four assessor sees that fou have not completed al es of the task comp desis of submission will be inest fou through the assessment feedback in Canvas LMS and o TEMPLATES PROVIDED: Project P