A company manufactures two wheeler passengers’ helmets. The initial stock on hand is 5000 units. The carrying cost is Rs. 2 per helmet per week and the lead time is two weeks. The ordering cost per order is Rs. 5000. The MPS of the final requirements is shown below. Develop a Material Requirement Plan (MRP I) by using EOQ method and determine the total inventory cost for the same.