xMABRYx132 xMABRYx132 24-01-2024 Physics contestada The speed of the mass at point A is 3.2 m/s, and at point B, it is 6.0 m/s. How much work is done on the mass between A and B by the force of friction? a. 3.8 J b. 6.8 J c. 9.6 J d. 12.2 J