Nobody is answering please help

Answer:
31.1 meters
Step-by-step explanation:
he uses 22 pieces of slate each 1.3 meters long so we multiply 22*1.3=28.6
then he adds one piece of slate which is 2.5 meters long so we add 2.5 to 28.6
2.5+28.6=31.1
Answer:
31.1 meters
Step-by-step explanation:
To find the total length of all the pieces, you add up the lengths of the individual pieces.
Rather than add 1.3 twenty-two times, most people use multiplication.
The sum of the lengths of the shorter pieces is ...
22 × 1.3 m = (22×1.3) m = 28.6 m
Adding that to the length of the one longer piece, we get the total length:
28.6 m + 2.5 m = 31.1 m
The path is 31.1 m long.
_____
You may find that problems that are simply the addition of numbers will be avoided by many answerers.