Answer:
d. 11.6
Step-by-step explanation:
The results of the first die and the second one are independent to each other. The expected value of Z is obtained, therefore, by summing the expected values of both X and Y, because Z = X+Y and X and Y are independent. As a result [tex] \mu_z = \mu_x + \mu_y = 3.6+8.0 = 11.6 . [/tex]