Answer:
c. Factory Overhead
Explanation:
The journal entry to record the application of the factory overhead cost is shown below:
Work in process A/c Dr XXXXX
To Factory overhead A/c XXXXX
(Being the factory overhead applied)
The applied factory overhead is computed after considering the predetermined overhead rate. The formula is shown below:
Predetermined overhead rate = (Total estimated manufacturing overhead) ÷ (estimated direct labor-hours)