Answer:200.97
Step-by-step explanation:
ok look I think this is solved so it is 268 bolts what is done in 28 minutes we divide 268 bolts by 28 minutes to see how many bolts are made each minute and the result is 9.5714 bolts per minute then we now do 9.57 for 21 minutes the result is 200.97