ckson, Inc. produces two different products (Product 5 and Product Z) using two different activities: Machining, which uses machine hours as an activity driver, and Inspection, which uses number of batches as an activity driver. The cost of Machining is $520,000, while the cost of Inspection is $40,000. Product 5 uses 25% of total machine hours and 65% of total batches. What is the total Machining cost assigned to Product Z?