Answer:
$85 per machine hour
Explanation:
Actual Budgeted
Fixed costs $50,000 $47,960
Machine hours – Assembly 1,900 1,976
Variable costs – Assembly $121,000 $120,000
since the single rate method does not distinguish between fixed or variable costs, in order to determine the cost allocation rate we must add the fixed allocation rate and the variable allocation rate:
total = $60.73 + $24.27 = $85 per machine hour