Answer:
51,000
Explanation:
Beginning WIP 0
Started into Production (60,000+15,000)
Total Units 75,000
Transferred Out (60,000 – 15,000)
= 45,000 = 45,000 equivalent conversion units
Ending WIP 15,000
= 15,000 * .4 = 6,000
45,000+6000 =51,000
Total Units 75,000 = 51,000 conversion total equivalent units
Therefore the equivalent units of production for conversion costs for the month of July is 51,000