Answer:
E $75
Explanation:
Using CAMP we solve for the Cost of equity on each and determinate which project are worht to invest on it
A
[tex]Ke= r_f + \beta (r_m-r_f)[/tex]
risk free = 0.045
rate premium market = (market rate - risk free) = 0.055
beta(non diversifiable risk) = 0.93
[tex]Ke= 0.045 + 0.93 (0.055)[/tex]
Ke 0.09615 = 9.615%
A 9.615% - 2.00% = 7.615% As the return is 7.60% we should reject
B 9.615% - 1% = 8.615% return of 9.15% we should Accept
C return of 10.10% while Ke 9.615% Accepted
D 9.615% + 1% = 10.615% return of 10.40% rejected
E 9.615% + 2% = 11.615% against 10.80% yield rejected
F cost of 11.615% ith return of 10.90% rejected
G cost of 11.615% with return of 13.00% Accepted
We accept three projectthus, we require $75