The figure shows the design of a greenhouse with a rectangular floor. The front and back sides of the greenhouse are semicircles with a diameter of w and the roof is half a cylinder. Consider greenhouse A with floor dimensions w=16 feet and l =18 feet.
A concrete slab 4 inches deep will be poured for the floor of greenhouse A. How many cubic feet of concrete are needed for the floor?

Respuesta :

9514 1404 393

Answer:

  96 cubic feet

Step-by-step explanation:

A volume that is 16 ft by 18 ft by 1/3 ft will be ...

  V = LWH

  V = (16 ft)(18 ft)(1/3 ft) = 96 ft³

96 cubic feet of concrete are needed.