At a factory, two machines pack bottles into boxes for shipping. Machine A can pack 8 boxes per minute, and Machine B can pack 11 boxes per minute.
1. Before shipment, an inspector found that 7 of the boxes were defective and could not be shipped. At least 200 boxes were approved for shipment. Write and solve an inequality to find the amount of time Machine A spent packing the boxes that were approved for shipment.