Considering the hypothesis tested, the most appropriate interval for the manager to use for such an estimate is given by:
b. A one-sample z-interval for a population proportion.
The manager will sample some residents, and if the proportion who is in favor of the new park is high enough, he builds the new park.
For the most appropriate test, we have that:
Hence, option B is correct.
More can be learned about an hypothesis test at https://brainly.com/question/16313918