In getting the predetermined overhead rate, the estimated total manufacturing overhead should be divided to the total amount of the allocation base. With that, the formula should be like this:
Estimated total manufacturing overhead = $230,200 + ($6.82 per machine-hour X 10,000 machine-hours) = $298,400
overhead rate = $298,400 / 10,000 = $29.84