An oil-drilling rig has dug a hole to a depth of -60 ft. after one full day and night of continuous
use. The rate of the rig stayed constant over that time.
Part A: The rig will be used to dig a second hole with a depth of -150 ft at the same rate as
before. How many hours will the rig take to complete digging the hole?

Respuesta :

Answer:

It will take 60 hrs

Hope this helped!

Answer:

It would take 60 hours for the rig to complete digging the -150 ft. hole.

Step-by-step explanation:

Hint: Using ratios will help solve questions like this one.

The first hole was dug -60 ft. below the surface for a whole day and night. A day lasts 12 hours and the same goes for a whole night. That's 24 hours in total. This will help answer Part A. A second hole was dug -150 ft. below the surface with the same rate as the first hole. Let's put this into a ratio.

-60 : 24

-150 : ?

Finding the scale factor in ratios will help solve for the missing value. We can divide -150 by -60 which results in 2.5. Multiply 2.5 by 24 and you will get 60 hours as your final answer. I hope you will find this helpful! :D